Unless it’s being done this morning there’s still a lot of cleaning up to do. Still loads of cones and unfinished hard shoulders.Passed through tunnel yesterday...expected 60kph speed limits to have been lifted on approach from M8 and N40 in preparation for Monday??
Better than the cold shoulder we're used to down here.Unless it’s being done this morning there’s still a lot of cleaning up to do. Still loads of cones and unfinished hard shoulders.
I suppose, covid, inflation, materials, fuel all going sky high during that time.2019
Transport body to be questioned on Dunkettle Interchange costs
Transport body to be questioned on Dunkettle Interchange costswww.echolive.ie
“The interchange upgrade was originally to cost €100m, but the price has already risen to €115m”
2020
Contracts for key Cork roads project to be awarded within days
The multi-million overhaul of the Dunkettle interchange at the intersection of the M8/N8 Dublin to Cork road, the N25 Cork to Waterford road and the N40 Southern Ring Road through the Jack Lynch Tunnel, handles some 100,000 vehicles a daywww.irishexaminer.com
“estimated by some to cost anything from €115m and €170m.”
2023
Night-time works blitz to finish €215m Dunkettle project by end of February
And while there is no official confirmation yet of a completion date, it is understood that engineers are working towards a target opening ceremony the week of February 12www.irishexaminer.com
Night-time works blitz to finish €215m Dunkettle project by end of February
Yup, morning is bliss now. Saves 10-15 minutes.Heading west from Little Island in the evening is a disaster, the amount of merging lanes ruin any hopes of free flowing traffic, this evening will see more traffic staying left with the M8 loop opening ...
the mornings are a lot better than before though, I'll give them that
Ya I worked in LI and take the back road out which generally has less of a tail back.Heading west from Little Island in the evening is a disaster, the amount of merging lanes ruin any hopes of free flowing traffic, this evening will see more traffic staying left with the M8 loop opening ...
the mornings are a lot better than before though, I'll give them that
What should they have done ?Whoever designed that new tunnel road layout needs to be bate to within an inch of his life !
Bridge.What should they have done ?