A pedestrian/cycle walkway linking into the park I believeThey are also building something over the south ring past Kinsale road roundabout.
A cycle path?
A pedestrian/cycle walkway linking into the park I believeThey are also building something over the south ring past Kinsale road roundabout.
A cycle path?
Yes that will connect the old dump with a walkway up to Grange that will come out opposite the Church there but more on the Douglas side.A pedestrian/cycle walkway linking into the park I believe
Well that is the offical date, if that is so then Sisk will make very little from the project, so their aim is to get it finished long before that date.This ongoing chaos til March 2024
Dunkettle interchange: New Little Island access routes and cycleway to open on Monday
Engineers working on the huge scheme have now advised road users to familiarise themselves with the new layout ahead of the openingwww.irishexaminer.com
And the days of being optimistic about timelines are long gone.Well that is the offical date, if that is so then Sisk will make very little from the project, so their aim is to get it finished long before that date.
What an absolute hellscape. The money would be far better spent on projects promoting active travel, walking, cycling and of course bus lanes to accommodate the electric buses of the future.
Ah fuck off you.What an absolute hellscape. The money would be far better spent on projects promoting active travel, walking, cycling and of course bus lanes to accommodate the electric buses of the future.
You can say that.And the days of being optimistic about timelines are long gone.
Much better to give a late completion date and when finished "early" you just say "Oh look at us, aren't we brilliant, we're months ahead of schedule".
Ah fuck off you.
Us motorists will continue though to pay out in taxes for your tree hugging, day dreaming and unused cycle lanes.
Be prepared for the €2.90 toll payable each time you go through, courtesy of The Green Party. Dan Boyle and Oliver Moran should proportionally toll the cycle way otherwise they will look like anti car radical green extremists.Is it all still on track to be completed by May(?) of 2023? Hopefully once it IS finished it'll immeasurably improve traffic flow through the tunnel - no more traffic light controlled roundabouts with their stop-start-stop again clogging up what should be (hopefully) a smooth flow.