★
DAON-PHOBLACHT
CHORCAÍ
Home
baile
Forums
fóraim
Tickets
ceol
Event Guide
Imeachtaí
Street Art
ealaíon sráide
Articles
ailt
Cork Slang
béarlagair
Contact
teagmháil
Shop
siopa
Articles
Cork Slang
Forums
Events
Shop
Search, boy
Order search results by
Date of last reply
Date thread created
Order search results by
Current events
Archive
Home
Forums
Forum list
Search forums
What's new
New posts
New profile posts
Latest activity
Members
Current visitors
New profile posts
Search profile posts
Log in
Register
What's new
Search
Search
Search titles only
By:
Forum list
Search forums
Menu
Log in
Register
Install the app
Install
Home
Forums
Current & Local Affairs
ParkCide reaches Atlantic Pond
JavaScript is disabled. For a better experience, please enable JavaScript in your browser before proceeding.
You are using an out of date browser. It may not display this or other websites correctly.
You should upgrade or use an
alternative browser
.
Reply to thread
Message
<blockquote data-quote="Stacky" data-source="post: 6975262" data-attributes="member: 22688"><p>He has 250 brand new safe parking spaces and still not happy.</p><p></p><p><em>Marina Park Phase 1.</em></p><p><em></em></p><p><em>The works will include hard and soft landscaped items, site clearance, adjustment of existing site levels (to form new water storage basins), surface water runoff drainage, diversion of an existing watercourse (complete with associated wiers), new pathways (both trafficked and non-trafficked), sand blasted concrete, resin bonded paving, natural stone paving, brushed concrete and a timber gantry walkway. It will also include provision and installation of park furniture, site lighting, rising main, water feature and all associated mechanical and electrical services.</em></p><p><em></em></p><p><em>A new 250 space car park with associated road and shared cycling / pedestrian path is to be provided along the existing marina, adjoining the Shandon Boat Club. The car parking bays are to consist of grasscrete. There will be some relocation and / or undergrounding of Electrical Lamp Standards and poles. The park will have an open framed steel structure, partially roofed and wall cladded that will house individual pod like structures including toilet facilities and a coffee shop (neither part of the contract but will be provided for with services.</em></p></blockquote><p></p>
[QUOTE="Stacky, post: 6975262, member: 22688"] He has 250 brand new safe parking spaces and still not happy. [I]Marina Park Phase 1. The works will include hard and soft landscaped items, site clearance, adjustment of existing site levels (to form new water storage basins), surface water runoff drainage, diversion of an existing watercourse (complete with associated wiers), new pathways (both trafficked and non-trafficked), sand blasted concrete, resin bonded paving, natural stone paving, brushed concrete and a timber gantry walkway. It will also include provision and installation of park furniture, site lighting, rising main, water feature and all associated mechanical and electrical services. A new 250 space car park with associated road and shared cycling / pedestrian path is to be provided along the existing marina, adjoining the Shandon Boat Club. The car parking bays are to consist of grasscrete. There will be some relocation and / or undergrounding of Electrical Lamp Standards and poles. The park will have an open framed steel structure, partially roofed and wall cladded that will house individual pod like structures including toilet facilities and a coffee shop (neither part of the contract but will be provided for with services.[/I] [/QUOTE]
Verification
Post reply
Home
Forums
Current & Local Affairs
ParkCide reaches Atlantic Pond
Top